Down to the Details

Dec18

The team is still working on the installation of our state of the art HVAC systems that will control the temperatures inside of Warehouse X. More work was done on details inside of Warehouse X this week, painting windows , installing barrel ricks, wood paneling, and we worked on our beautiful limestone retaining wall outside of Warehouse X.